Analysis Of Problems In The Development Of The Outside Medan City Ring Road

by ADMIN 76 views

Analysis of Problems in the Development of the Outside Medan City Ring Road

Introduction

The construction of an outer ring road in Medan has been experiencing various problems that hamper project progress. The main problems include complex land acquisition, limited financing, inadequate quality of work, and the poor drainage system. In addition, the low absorption of loan funds, delays in implementation time, and various other problems contribute to the situation. As a result of all these problems, the construction of the outer ring road in Medan cannot be resolved and operates optimally, which in turn disrupts the arrangement of traffic movement patterns in the city.

Background of the Study

The construction of an outer ring road in Medan is a vital infrastructure project aimed at improving traffic flow and reducing congestion in the city. However, the project has been plagued by various problems that have hindered its progress. The main problems include complex land acquisition, limited financing, inadequate quality of work, and the poor drainage system. These problems have resulted in delays, cost overruns, and a lack of transparency in the project implementation process.

Research Objectives

This study aims to identify problems in the construction of the Medan City Outside Ring Road, analyze the effect of problems on project implementation schedules, design and financing, as well as proposing efforts to handle existing issues. The research method used is descriptive, with primary data collection through questionnaires distributed to 60 respondents from related agencies and residents who live along the outer ring road.

Research Methodology

The research method used in this study is descriptive, with primary data collection through questionnaires distributed to 60 respondents from related agencies and residents who live along the outer ring road. The questionnaire was designed to gather information on the problems encountered in the construction of the outer ring road, the effect of these problems on project implementation schedules, design and financing, and the proposed solutions to handle existing issues.

Research Results

The results of the analysis show that the main problem in the construction of this road is land acquisition, which is the dominant factor with a percentage of 36.67%. In addition, the poor drainage system along the road is also a concern with a percentage of 10%, followed by late implementation of projects which reached 8.33%. From this result, it can be concluded that the issue of land acquisition is very crucial for the continuity of the project.

Factors Causing Delays

The Spearman correlation rate shows that the project implementation schedule is hampered by a value of 0.44, while the construction costs correlated 0.57 and a road design with a value of 0.32. The main cause of the delay is the lack of land acquisition, which contributes 40% of the existing problems, followed by limited funds and lack of professionalism of the project manager.

Factors Causing Design Changes

Changes in road design are common, including related to increasing unit costs, changes in sub drainage, and changes in excavation volume and landfill. The main causes of this design change include inaccuracy in design planning for arterial roads, errors in the prediction of soil conditions, and fluctuations in the price of unexpected building materials. In addition, the mismatch between planning and conditions in the field and lack of attention to the drainage system also contributes to this problem.

Handling Solutions and Priorities

In order for the construction of the Medan City Out of Ring Road to take place smoothly, some of the proposed solutions include adjusting the value of community land compensation in accordance with market prices, accelerating the project implementation process, increasing the professionalism of project management and implementing, and maintaining transparency in the land compensation process. The priority scale in dealing with this problem should be focused on land acquisition with an allocation of 40%, followed by an increase in socialization and approach to the community which reached 18.33%.

Conclusion

Through this in-depth analysis, it can be concluded that the problem-solving in the development of the Medan City Outside Ring Road is very important to achieve the goal of effective and efficient traffic structuring. Planned and collaborative handling between the government and the community will be the key to success in completing this project.

Recommendations

Based on the findings of this study, the following recommendations are made:

  • The government should prioritize land acquisition and ensure that the compensation process is transparent and fair.
  • The project implementation process should be accelerated to minimize delays and cost overruns.
  • The professionalism of project management and implementing should be increased to ensure that the project is completed on time and within budget.
  • The community should be involved in the project implementation process to ensure that their concerns and needs are addressed.

By implementing these recommendations, the construction of the Medan City Out of Ring Road can be completed smoothly and efficiently, and the traffic movement patterns in the city can be improved.
Frequently Asked Questions (FAQs) about the Analysis of Problems in the Development of the Outside Medan City Ring Road

Q&A

Q: What are the main problems encountered in the construction of the Medan City Outside Ring Road?

A: The main problems encountered in the construction of the Medan City Outside Ring Road include complex land acquisition, limited financing, inadequate quality of work, and the poor drainage system.

Q: What is the dominant factor contributing to the problems in the construction of the Medan City Outside Ring Road?

A: The dominant factor contributing to the problems in the construction of the Medan City Outside Ring Road is land acquisition, which accounts for 36.67% of the total problems.

Q: What are the effects of the problems on project implementation schedules, design and financing?

A: The problems in the construction of the Medan City Outside Ring Road have a significant effect on project implementation schedules, design and financing. The Spearman correlation rate shows that the project implementation schedule is hampered by a value of 0.44, while the construction costs correlated 0.57 and a road design with a value of 0.32.

Q: What are the main causes of design changes in the construction of the Medan City Outside Ring Road?

A: The main causes of design changes in the construction of the Medan City Outside Ring Road include inaccuracy in design planning for arterial roads, errors in the prediction of soil conditions, and fluctuations in the price of unexpected building materials.

Q: What are the proposed solutions to handle the existing problems in the construction of the Medan City Outside Ring Road?

A: The proposed solutions to handle the existing problems in the construction of the Medan City Outside Ring Road include adjusting the value of community land compensation in accordance with market prices, accelerating the project implementation process, increasing the professionalism of project management and implementing, and maintaining transparency in the land compensation process.

Q: What is the priority scale in dealing with the problems in the construction of the Medan City Outside Ring Road?

A: The priority scale in dealing with the problems in the construction of the Medan City Outside Ring Road should be focused on land acquisition with an allocation of 40%, followed by an increase in socialization and approach to the community which reached 18.33%.

Q: What is the conclusion of the analysis of problems in the development of the Outside Medan City Ring Road?

A: The conclusion of the analysis of problems in the development of the Outside Medan City Ring Road is that the problem-solving in the development of the Medan City Outside Ring Road is very important to achieve the goal of effective and efficient traffic structuring. Planned and collaborative handling between the government and the community will be the key to success in completing this project.

Q: What are the recommendations for the government and the community to handle the problems in the construction of the Medan City Outside Ring Road?

A: The recommendations for the government and the community to handle the problems in the construction of the Medan City Outside Ring Road include:

  • The government should prioritize land acquisition and ensure that the compensation process is transparent and fair.
  • The project implementation process should be accelerated to minimize delays and cost overruns.
  • The professionalism of project management and implementing should be increased to ensure that the project is completed on time and within budget.
  • The community should be involved in the project implementation process to ensure that their concerns and needs are addressed.

By implementing these recommendations, the construction of the Medan City Out of Ring Road can be completed smoothly and efficiently, and the traffic movement patterns in the city can be improved.